コンテンツへスキップ ナビゲーションに移動

JASMA

  • Top
  • About Us
    • About JASMA
    • About RMA
    • About EMA
  • RVSM
    • About RVSM
    • RVSM Approvals
    • LHD
    • Minimum Monitoring Requirements
    • Monitoring Measures
  • HMU
    • Monitoring Process
    • HMU Status
    • Monitoring Request
    • Monitoring Result
  • PBN/PBCS
    • About PBN
    • About PBCS
    • About PBHSM
    • PBN/PBCS Approval
    • LLD/LLE
    • PBCS Monitoring
  • Wake Turbulence
    • About eWTS
    • Encounter Report
  • Documents
  • Links
    • RMAs/EMAs
    • ICAO
  • Contact

Documents

  1. HOME
  2. Documents
Contact Registration Form
    Japanese:

  • Form F1: Contact or change of contact details (Word)
  • English:

  • Form F1: Contact or change of contact details (Word)
Approval Related Forms

Japanese:

  • Form F2: Record of approval to operate in RVSM airspace and/or on PBN routes(Word)
  • Form F3: Withdrawal of approval to operate in RVSM airspace and/or on PBN routes (Word)

English:

  • Form F2: Record of approval to operate in RVSM airspace and/or on PBN routes (Word)
  • Form F3: Withdrawal of approval to operate in RVSM airspace and/or on PBN routes (Word)
Safety Assessment Related Forms
  • Template of reporting Large Height Deviation (PDF)
References

Japanese:

  • Operating procedure for the safety assessment of the RVSM airspaces and the height keeping performance monitoring (26 Jan 2016)
  • Operating procedure for the horizontal safety assessment of the PBHSM airspace
  • Operating procedure for the oceanic ATC data link operation assessment, the communication performance assessment and the technical improvement

English:

  • RVSM Minimum Monitoring Requirements (MMR) (Version 2019.0)
  • Operating procedure for the safety assessment of the RVSM airspaces and the height keeping performance monitoring (26 Jan 2016)

Copyright © JASMA All Rights Reserved.

Powered by WordPress & Lightning Theme by Vektor,Inc. technology.

MENU
  • Top
  • About Us
    • About JASMA
    • About RMA
    • About EMA
  • RVSM
    • About RVSM
    • RVSM Approvals
    • LHD
    • Minimum Monitoring Requirements
    • Monitoring Measures
  • HMU
    • Monitoring Process
    • HMU Status
    • Monitoring Request
    • Monitoring Result
  • PBN/PBCS
    • About PBN
    • About PBCS
    • About PBHSM
    • PBN/PBCS Approval
    • LLD/LLE
    • PBCS Monitoring
  • Wake Turbulence
    • About eWTS
    • Encounter Report
  • Documents
  • Links
    • RMAs/EMAs
    • ICAO
  • Contact
Translate »